SAP Business Warehouse Job
Control-M for SAP Business Warehouse connects to SAP Application Server or SAP Message Server according to the Connection Profile. The SAP Business Warehouse job enables you run pre-defined SAP Process Chains
The following table describes the SAP Business Warehouse job type attributes:
|
Attribute |
Description |
|---|---|
|
Connection Profile |
Defines the connection profile for the job. Rules:
|
|
Process Type |
Determines the task that the job performs. The available option is Process Chain, which runs a Process Chain SAP BW job. Variable Name: %%SAPR3-JOB_MODE |
|
Process Chain Characteristics |
Defines the characteristics of the SAP Process Chain. Variable Name: %%SAPR3-ProcessChain_Desc |
|
ID |
Defines a unique BW-generated ID of a Process Chain. Rules: Characters 1-30 Variable Name: %%SAPR3-ProcessChain_ID |
|
Description |
Describes a Process Chain. Rules: Characters 1-60 |
|
Info Package Description |
Provides a description of the Info Package in free text. Rules: Characters 1-60 Variable Name: %%SAPR3-InfoPackage_Desc |
|
Tech. Name |
Defines a unique BW-generated InfoPackage ID. Rules: Characters 1-30 Variable Name: %%SAPR3-InfoPackage_TechName |
|
Background Job Name |
Defines the InfoPackage background job name. Rules: Characters 1-25 Variable Name: %%SAPR3-BACKJOBNAME |
|
Rerun Options |
Determines how the Process Chain reruns if the job fails, as follows:
|
|
More Options |
Click for more options. |
|
Enable periodic job |
Determines whether the first run of the Process Chain prepares for the next run and is useful for reruns when big Process Chains are scheduled. |
|
Consider only the overall chain status |
Determines whether to consider the status of the overall Process Chain. |
|
Retrieve log |
Determines whether to add the Process Chain logs to the job output |
|
Detect Spawned Jobs |
Determines whether to detect and monitor jobs that were spawned by the current SAP job. |
|
Detect and Create by |
Determines the properties of the detected job. |
|
Job name |
Detected spawned jobs of the current job are extracted to Control-M with identical properties to the specified job. |
|
Start spawned job |
Checks the status of each spawned job and starts any spawned job with Scheduled status. |
|
Job ends only after all child Jobs complete on SAP |
Determines whether a job completes its execution only after all child jobs complete, as follows:
|
|
Job completion status depends on child Job status |
Determines whether to wait for all child jobs to complete. The parent job does not end OK if any child job fails. |