Introduction to Control-M Conversion
Control-M Conversion assists you with converting your workflows from your current scheduler or application to Control-M.
Converting Workflows to Control-M
This procedure describes how to convert your workflows to Control-M.
Begin
- 
                                                        From your current scheduler or application, extract the data as described in Source Data Extraction. If you can not find your scheduler in Source Data Extraction, use Control-M Self Conversion to convert your data. 
- 
                                                        Convert the extracted data to Control-M data and load it into the Control-M environment, as described in Converting to Control-M. 
- 
                                                        Resolve conversion issues inside the Control-M environment, as described in Post-Processing. 
Setting Up the Conversion Tool
This procedure describes how to setup the Conversion Tool.
Begin
- 
                                                        Download the Conversion Tool from the following link: 
- 
                                                        Unzip the file. 
- 
                                                        Double click Conversion.bat 
Verification Tool
Conversion includes a Verification Tool, which enables you to compare Scheduler forecasts and execution history reports with Control-M forecast and execution reports.
Relevant for the following schedulers:
- 
                                                        ASG-Zeke 
- 
                                                        ASG-Zena 
- 
                                                        Broadcom Dollar Universe 
- 
                                                        Broadcom-AutoSys 
- 
                                                        Broadcom-ESP 
- 
                                                        Broadcom Unicenter WLM (TNG) 
- 
                                                        Broadcom-7 
- 
                                                        IBM TWS (DS & MF) 
The Verification Tool produces a report for each date, which indicates the following:
- 
                                                        Jobs that have run or planned to run by the Scheduler but are missing from Control-M. 
- 
                                                        Jobs that have run or planned to run by Control-M but are missing from the Scheduler. 
The report helps you to verify that the definitions in Control-M are functionally equivalent to those in the legacy tool.
You can access the Verification Tool by clicking  and selecting Verification Tool.
and selecting Verification Tool.